Yuhong No1 Anti-Wall Cancer / Anti-Permeability Waterproof 1kg
Description
This product is based on cement and is made of an excellent rigid impervious inorganic waterproof material processed with active inorganic silicon masterbatch and other additives. The active inorganic silicon penetrates into the pores of the concrete through the carrier to form water-insoluble crystals, which makes the product have a unique crack self-repairing property, super strong adhesion, and impermeability.
Features
- Super strong adhesion and impermeability, non-toxic, no heavy metals, no formaldehyde
- Excellent gas permeability and adding a green fungicide to prevent mold growth
- Can be used on wet base (no running water)
- Moisture-proof, mildew proof, dry and beautiful
- The preferred waterproof material for leakage of building walls.
Item | Standard Index | Item | Standard Index |
7 days compressive strength/MPa | ≥24 | Coating mortar impermeability pressure / MPa | ≥1.0 |
7 days flexural strength/MPa | ≥3 | Coated concrete impermeability pressure / MPa | ≥1.0 |
28 days compressive strength/ MPa | ≥30 | Secondary impermeability pressure of coated concrete / MPa | ≥0.8 |
28 days flexural strength/MPa | ≥5 | Transverse deformation ability | ≥1.2 |
7-day wet base bonding strength / MPa | ≥1.2 | Alkali resistance | No cracking, no peeling |
Heat resistance | No cracking, no peeling | Frost resistance | No cracking, no peeling |
Scope of Application
New and old concrete, brick, slag blocks and other wall floors, basements, tunnels, tunnels, granaries, cellars, retaining walls, aquatic ponds, swimming pools, landscapes. Both the welcome and backwater surfaces of the pool and sewage treatment tank can be used.
Construction Features
- The running water on the wet base surface needs to be plugged after construction
- Clean the base surface: remove the surface finish of the wall to the structural wall;
- Wet base surface: Wet the base surface to be wetted with clean water first, and increase the adhesion between the waterproof layer of the base layer;
- Material preparation: When using the anti-seepage waterproof coating on the back surface, directly mix the water with water = 1: (0.32~0.35), stir with a power agitator for 5~7 minutes, let stand for 2 minutes, and then stir for 3~5 minutes. Ready to use
- Painting construction: brushing with a brush or roller, brushing twice, brushing a time interval of 12 hours, brushing back and forth in the cross direction.
- Product dosage: thickness 1.2~1.5mm, brushing twice per square meter, 1.5~2kg.
Disclaimer
All product images shown are for illustration purposes only. Actual products may be varied in terms of size, type, brand, version, color, and other relevant characteristics.